First truck progress in a while. Shamelessly stole the setup for a Windstar electric fan from
@iverger as written about in
this thread.
Been studying for the PMP exam, trying to use some of the contents of that learning and put it to use for this truck project. Went ahead and made a long list of everything I need to do and assigned a difficulty based on an 11 point scale, though will revise this for a 21 point for better clarity. Essentially did planning poker like you would in Agile/Scrum. Decided to get the fan setup first since it is a PITA to install with all the accessories attached.
Will work on resealing the engine once more, then redoing fuel lines and rear wiring since I don't like how I originally did them. Next steps after that are the
entire rest of the truck.
You must be registered for see images attach
You must be registered for see images attach
You must be registered for see images attach