Not to get in the middle of this discussion, I have no opinion as to what is right, wrong or unnecessary. This how the assemble line at the manufacturer does it, at least at Ford Mtr.Co. LEP. The block travels on an overhead conveyor line hung on a carrier like an upside down question mark ?, it can be rotated 360*, The head gaskets are slapped on, next station the heads are put on, next station all head bolts are inserted and engine rotated, next station one man with a hugh bolt driver torques down half the bolts, next station, same operation, next station head bolts are sample checked manually for proper torque, then the engine is rotated for the same operation in the next two stations. If any bolt found not torqued to specs, it is switched off line to a repair conveyor. The bolt drivers are air driven, if too many bolts are not torqued to spec, then the defective driver is exchanged for a spare driver. On the off/next shift all bolt drivers on the assembly line are checked and the torque set for the next day. If there is two shifts on the same assembly line, the bolt drivers, all of them on the line are exchanged. Each station has 20 seconds to perform it's function. The man doing the head bolt rundown, has to walk sideways the speed that the line is running, then return to his previous location to catch the next engine. The engines are spaced about 4-5 ft apart on the conveyor.