Weigh that sucker and name your price, brother. I'm at 89011; slowest, cheapest shipper you can find. I don't need the lid, the lid bolts, or anything else, just the main casting.
When I sandcast my new design, the first one is yours.
Weigh that sucker and name your price, brother. I'm at 89011; slowest, cheapest shipper you can find. I don't need the lid, the lid bolts, or anything else, just the main casting.
When I sandcast my new design, the first one is yours.