cowman79
Full Access Member
Well I picked my engine up from the machine shop today. I had all eight cylinders sleeved and bored to stock. I have new pistons and rings. Installed all new cam bearings, main bearings and rod bearings. I had a valve job done on both heads and had to replace three intake valves. I also have a new carter fuel pump to install. I will be installing the tins the first of the week and hope to have it running by the end of next week. If you guys see any thing I need to check let me know.