I just talked with John at diamond eye's r and d facility, about a 4" obs pipe. ..
He needs a 7.3 idit, so he can prototype a y pipe and 3" dp bolt on kit.
He needs a test mule, will be on the rack around 4 days, the owner will get a free pipe.
He said he is around pendelton ore.
800-636-9950
If someone in the region can spare something decent mostly stock, as they need to see clearances and routing....for r. And d. this could be a great way to bolt on a system.
he would be in production inside of 30 days of the prototype ing..
He needs a 7.3 idit, so he can prototype a y pipe and 3" dp bolt on kit.
He needs a test mule, will be on the rack around 4 days, the owner will get a free pipe.
He said he is around pendelton ore.
800-636-9950
If someone in the region can spare something decent mostly stock, as they need to see clearances and routing....for r. And d. this could be a great way to bolt on a system.
he would be in production inside of 30 days of the prototype ing..
Last edited: