Ok coffee pot half empty....
So 1356 w\pto is a rare bird...
Sounds like a pass drop pto?
Do you have the pto drive (sounds like hens teeth to find)?
Back to d.e. Design test mule.
The way you describe it they ham handed the process and failed to follow thru???
The pto winch deal (if you already have it) would add a shiton of weight and extra plumbing, these seem to be usually set aside for wrecker duty but undeniably stout.
Ground clearance will be compromised, a good electric will be fine 90% of most folks usage.
One of my buggy guys runs one it's a beast.
Sad the install sounds lacking.
How did the downpipe to aft pipe setup turn out?
Is it worth using it as a pattern if it was worth your wild to do so?
So 1356 w\pto is a rare bird...
Sounds like a pass drop pto?
Do you have the pto drive (sounds like hens teeth to find)?
Back to d.e. Design test mule.
The way you describe it they ham handed the process and failed to follow thru???
The pto winch deal (if you already have it) would add a shiton of weight and extra plumbing, these seem to be usually set aside for wrecker duty but undeniably stout.
Ground clearance will be compromised, a good electric will be fine 90% of most folks usage.
One of my buggy guys runs one it's a beast.
Sad the install sounds lacking.
How did the downpipe to aft pipe setup turn out?
Is it worth using it as a pattern if it was worth your wild to do so?